Project Retrospective for College Accountability - Phase 1

...

To Do

Jira Legacy
serverSystem JIRA
columnskey,summary,due,assignee,status
maximumIssues20
jqlQueryproject = ODSPA and issuetype = Epic and component = "CA" and (labels != 'PN' and labels != 'PX') and status = "Open" ORDER BY Rank DESC
serverIdf7b1f4ca-a0c8-3f46-b155-0faf9c5437c7

In Progress - Analysis

Jira Legacy
serverSystem JIRA
columnskey,summary,due,assignee,status
maximumIssues40
jqlQueryproject = ODSPA and issuetype = Epic and component = "CA" and (labels != 'PN' and labels != 'PX') and status = "Analysis" ORDER BY Status DESC
serverIdf7b1f4ca-a0c8-3f46-b155-0faf9c5437c7

In Progress - Development

Jira Legacy
serverSystem JIRA
columnskey,summary,due,assignee,status
maximumIssues200
jqlQueryproject = ODSPA and issuetype = Epic and issuetype != Plan and component = "CA" and (status != "Open" and (labels != 'PN' and labels != 'PX') and status = "Development") ORDER BY Status DESC
serverIdf7b1f4ca-a0c8-3f46-b155-0faf9c5437c7

In Progress - Review or UAT

Jira Legacy
serverSystem JIRA
columnskey,summary,due,assignee,status
maximumIssues20
jqlQueryproject = ODSPA and issuetype = Epic and issuetype != Plan and component = "CA" and (labels != 'PN' and labels != 'PX') and (status = "Review" or status = "UAT") ORDER BY Status DESC
serverIdf7b1f4ca-a0c8-3f46-b155-0faf9c5437c7

Completed

Jira Legacy
serverSystem JIRA
columnskey,summary,due,assignee,status
maximumIssues200
jqlQueryproject = ODSPA and issuetype != Story and component = "CA" and (labels != 'PN' and labels != 'PX') and status = "Done" ORDER BY Rank DESC
serverIdf7b1f4ca-a0c8-3f46-b155-0faf9c5437c7

Not Prioritized in New College Accountability

Jira Legacy
serverSystem JIRA
columnskey,summary,due,assignee,status
maximumIssues20
jqlQueryproject = ODSPA and issuetype = Epic and component = "CA" and labels = "PN" ORDER BY Rank DESC
serverIdf7b1f4ca-a0c8-3f46-b155-0faf9c5437c7

Not included in New College Accountability

Jira Legacy
serverSystem JIRA
columnskey,summary,due,assignee,status
maximumIssues20
jqlQueryproject = ODSPA and issuetype = Epic and component = "CA" and labels = "PX" ORDER BY Rank DESC
serverIdf7b1f4ca-a0c8-3f46-b155-0faf9c5437c7

...

Anchor
Project-Decisions-and-Action-Items
Project-Decisions-and-Action-Items

Action Items

  •  Chirag Jain to resize tiles, add legend and add links to Strategic Plan and Accountability Plan.
  •  Sangita Singh Shruti Kumar to reach out to Mike Bolen for undergraduate research data.
  •  Shruti Kumar to get date from Mike Bolen on when he will deliver data.
  •  Valeria Garcia to provide verbiage for College Accountability Landing Page
  •  Shruti Kumar and Sarah Thomas to put links in Confluence that if and when they are provided by RMA documentation. ON HOLD
  •  Valeria Garcia , Sarah Thomas and Brisey Lopez Bello to complete College Accountability process documentation. IN PROGRESS
  •  Chirag Jain Make header font smaller
  •  Chirag Jain If links are not available, break the link, so there is no underline and it is not clickable
  •  Chirag Jain Add subtitle “Strategic Plan & Metrics Alignment.
  •  Chirag Jain Add anchor to legend
  •  Chirag Jain Text should be after College Accountability title and above tiles
  •  Chirag Jain Change the click tile color
  •  Chirag Jain Look into the feasibility of expanding a section when clicking the corresponding tile
  •  Chirag Jain Increase font size in tiles
  •  Chirag Jain Move the “Goals” header under each accordian
  •  Chirag Jain Add the “Additional Links” title at the bottom of the page above the added links
  •  Chirag Jain Add Metrics Crosswalk links to the links at the bottom of the page
  •  Sangita Singh Check to see if SUS Acct. Plan uses the word “percent” or “percentage” and use the same wording for the College Acct. metrics
  •  Sarah Thomas Send request for updates to Slolam contract to Slolam.
  •  Sarah Thomas Ensure Slolam contract makes it through Bull Marketplace.
  •  Shruti Kumar Remove the word “Draft” from Confluence CA Metrics page.
  •  Chirag Jain Add Metrics Crosswalk to links on CA page
  •  Sarah Thomas Add to IT-ODS Meeting agenda awareness of the Slolam contract.
  •  Shruti Kumar Document change for the new CA, link on web page for changes.
  •  Sarah Thomas Review project risk - external data from Research

Project Decisions

4/26/2023

  • At our next meeting, we review final changes and discuss when to make this public.

  • Slolam contract will have a start date of June 5 to get provisioning. Workshop to be during the June 19th week.

4/19/2023

  • Start date for Slolam Consulting SOW is mid-June, specifically, June 19

  • Team decided that we need to have the 8-10 metrics picked out before Slolam engages in the SOW, as well as the college “pages” layout/content defined.

  • Sangita is comparing the granularity of the College Accountability Dashboards with the previous years College Review reports. So far, she has found that additional granularity is needed for some metrics.

  • Document what has changed with the new College Accountability, this should be linked from the front page narrative.

4/17/2023

  • Review of College Accountability web page. The following are items that have been added to the action item list.

    • Make header font on page smaller.

    • If links are not available yet, then break the link (no link set) so it will not appear clickable.

    • Add “Strategic Plan & Metrics Alignment” title

    • Add anchor to legend

    • Landing page should be after College Accountability title and above tiles.

4/7/2023

  • Chirag to resize tiles, add legend, add links for Strategic Plan and Accountability Plan

  • Chirag demonstrated the College Accountability web page.

  • Web pages links have been put into a database, so they are easy to change. No links are hard-coded.

  • If a link is not available, it will either not appear or it will let the viewer know.

  • Valeria wants this put behind single sign on. Chirag will provide an estimate.

  • Valeria will provide introductory language on landing page for College Accountability.

  • Chirag to resize tiles, add legend, add links for Strategic Plan and Accountability Plan

  • Mike Bolen to provide data for undergraduate research. SSRA will reach out.

...

  • Faculty Awards will include the TARU list of awards as well as others

  • Alumni Giving will be renamed as Gifts Received (percentage)

  • Add epic for Endowment

  • Epic labeled “CA - Metrics Not in PPA but in Strategic Plan” will not be included in the new College Accountability as most of these data are not available at the college level or are not meaningful.

Project Risks

  • The April 17th is the deadline to have all reports created and attempt to display all on the website. The April 17th deadline was a soft deadline and it was extended due to issues brought up by testing, but all were cosmetic changes. Risk was realized and deadline extended. Closed Risk.

  • Receiving external data is dependent upon all departments outside of ODS is not guaranteed. As of April 26th, we do not have the Research dashboards completed.

  • Chirag was busy with IPEDS HR until 4/4. He said he will be able to complete and show by 4/7 College Accountability meeting. Not realized. Chirag was held up in completing all work by 4/17 due to a conflict in priorities, however, he has the code complete and is working on small cosmetics changes requested by the team. Closed Risk.